Guidance for the proper installation of cable in generating stations and industrial facilities is provided in this recommended practice.
- Standard Committee
- PE/IC - Insulated Conductors
- Status
- Active Standard
- PAR Approval
- 2015-09-03
- Superseding
- 1185-2010
- Board Approval
- 2019-11-07
- History
-
- Published:
- 2020-05-15
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/IC - Insulated Conductors
- Working Group
-
D05W_WG/P1185 - Station Cable Installation Criteria Working Group
Learn More About D05W_WG/P1185 - Station Cable Installation Criteria Working Group - IEEE Program Manager
- Michael Kipness
Contact Michael Kipness - Working Group Chair
- John Merando
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
1185-2010
IEEE Recommended Practice for Cable Installation in Generating Stations and Industrial Facilities
Guidance for the proper installation of cable in generating stations and industrial facilities is provided.
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards