A structured framework for the incorporation of human/system interactions into probabilistic risk assessments is provided.
- Standard Committee
- PE/NPE - Nuclear Power Engineering
- Status
- Superseded Standard
- Superseded by
- 1082-2017
- Board Approval
- 1997-09-16
- History
-
- ANSI Approved:
- 1998-04-27
- Published:
- 1996-11-30
- Reaffirmed:
- 2010-09-30
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/NPE - Nuclear Power Engineering
- Working Group
-
WG_5.4 - Conferences and Liaison
Learn More About WG_5.4 - Conferences and Liaison - IEEE Program Manager
- Christian Orlando
Contact Christian Orlando - Working Group Chair
- Ron Boring
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards