This corrigendum • updates three number errors in Table 10, • aligns currency values in the examples in Annex A with the general currency value in table A.1, and • updates all currency values to remove dollar signs and to change to generic currency signs.
- Standard Committee
- PE/T&D - Transmission and Distribution
- Status
- Active PAR
- PAR Approval
- 2022-12-03
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/T&D - Transmission and Distribution
- Working Group
-
1806_WG - Working Group on Switching and Overcurrent Protection - P1806
Learn More About 1806_WG - Working Group on Switching and Overcurrent Protection - P1806 - IEEE Program Manager
- Michael Kipness
Contact Michael Kipness - Working Group Chair
- Clay Stocklin
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
1806-2021
IEEE Guide for Reliability-Based Placement of Overhead and Underground Switching and Overcurrent Protection Equipment up to and Including 38 kV
Analytical techniques to assist in the placement of switching and overcurrent protection devices on distribution feeders for reliability purposes is provided in this guide.
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards