A general form for the preparation of test procedures is provided in this standard. Points to be considered by technical committees in the preparation of specific instructions for the thermal evaluation of insulation systems for electric equipment are suggested. The test procedures involve accelerated thermal aging of insulation systems and specify tests that the committees deem pertinent based on conditions of use. The objective of the procedures is to provide for the functional evaluation, by test, of insulation systems for electric equipment.
- Standard Committee
- BOG/SESCom/SC04 - SC04 - Electrical Insulation
- Status
- Active Standard
- PAR Approval
- 2016-05-12
- Superseding
- 99-2007
- Board Approval
- 2019-11-07
- History
-
- Published:
- 2020-07-17
Working Group Details
- Society
- Standard Committee
- BOG/SESCom/SC04 - SC04 - Electrical Insulation
- Working Group
-
P99 - SC 04 -Thermal Evaluation - Insulation Systems Working Group
Learn More About P99 - SC 04 -Thermal Evaluation - Insulation Systems Working Group - IEEE Program Manager
- Malia Zaman
Contact Malia Zaman - Working Group Chair
- Evanne Wang
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
99-2007
IEEE Recommended Practice for the Preparation of Test Procedures for the Thermal Evaluation of Insulation Systems for Electrical Equipment
Revision of IEEE Std 99-1980. A general form is provided for the preparation of test procedures. Points to be considered by technical committees in the preparation of specific instructions for the thermal evaluation of insulation systems for electric equipment are suggested. The test procedures involve accelerated thermal aging of insulation systems and specify tests that the committees deem pertinent, based on conditions of use. The objective of the procedures is to provide for the functional evaluation, by test, of insulation systems for electric equipment.
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards