Active Standard

IEEE C37.103-2015

IEEE Guide for Differential and Polarizing Relay Circuit Testing

The issues concerning testing and verification of the correctness of differential and polarizing circuits are described and discussed in this guide. The intention of this guide is to help the reader to detect errors in the wiring of protective relays that might cause erroneous operations of protection systems. It is essential to follow systematic testing procedures and record the observations in a proper organized manner. The records should include documentation of all measurements and a comparison with the desired results.

Standard Committee
PE/PSRCC - Power System Relaying and Control
Status
Active Standard
PAR Approval
2012-06-08
Superseding
C37.103-2004
Board Approval
2015-09-03
History
ANSI Approved:
2017-01-09
Published:
2015-12-17

Working Group Details

Society
IEEE Power and Energy Society
Standard Committee
PE/PSRCC - Power System Relaying and Control
Working Group
C37.103_WG - (Inactivated)Differential and Polarizing Relay Circuit Testing
Learn More About C37.103_WG - (Inactivated)Differential and Polarizing Relay Circuit Testing
IEEE Program Manager
Malia Zaman
Contact Malia Zaman
Working Group Chair
Gary Kobet

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


C37.103-1990
IEEE Guide for Differential and Polarizing Relay Circuit Testing

Withdrawn Standard. Withdrawn Date: May 20, 1996. No longer endorsed by the IEEE. The following topics were dealt with: IEEE C37.103-1990, IEEE Guide for Differential and Polarizing Relay Circuit Testing, covers the testing and verification required to ensure correct connections for ground relay polarizing and differential relay connections. Relay calibration, setting, insulation, and instrument transformer tests are referred to in this guide and are assumed to be developed by the individual user. This guide is not intended to discuss these aspects in detail.

Learn More About C37.103-1990

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.