Superseded Standard

IEEE C57.113-1991

IEEE Guide for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors

The detection and measurement by the wide-band apparent charge method of partial discharges occurring in liquid-filled power transformers and shunt reactors during dielectric tests are covered. This standard covers the measuring instrument, calibrator characteristics, test circuits, calibration procedure, and partial discharge measurement during induced-voltage tests.

Standard Committee
PE/TR - Transformers
Status
Superseded Standard
Superseded by
C57.113-2010
Superseding
C57.113-1988
Board Approval
1991-12-05
History
ANSI Approved:
2003-03-31
Published:
1991-11-30
Reaffirmed:
2002-12-11

Working Group Details

Society
IEEE Power and Energy Society
Standard Committee
PE/TR - Transformers
Working Group
Dielectric-WGC57.113 - Dielectric Tests - WG on PD Measurement Working Group
Learn More About Dielectric-WGC57.113 - Dielectric Tests - WG on PD Measurement Working Group
IEEE Program Manager
Patrycja Jarosz
Contact Patrycja Jarosz
Working Group Chair
Ali Naderian Jahromi

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


PC57.113
IEEE Draft Recommended Practice for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors

Wideband measurement of the apparent charge of partial discharges (PDs) that may occur in liquid-filled power transformers and shunt reactors excited by ac test voltages between 40 Hz and 400 Hz are discussed. The major components of the PD measuring circuit including the calibrator are specified in compliance with IEC 60270. The PD test procedure is described and recommendations for the evaluation of PD test results are presented.

Learn More About PC57.113

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


C57.113-2010
IEEE Recommended Practice for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors

Wideband measurement of the apparent charge of partial discharges (PDs) that may occur in liquid-filled power transformers and shunt reactors excited by ac test voltages between 40 Hz and 400 Hz are discussed. The major components of the PD measuring circuit including the calibrator are specified in compliance with IEC 60270. The PD test procedure is described and recommendations for the evaluation of PD test results are presented.

Learn More About C57.113-2010

Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.