General recommendations for measuring voltage transients in dry-type distribution and power transformers are provided. Recurrent surge voltage generator circuitry, instrumentation, test sample, test point location, mounting the test coil, conducting the test, and reporting results are covered.
- Standard Committee
- PE/TR - Transformers
- Status
- Active Standard
- PAR Approval
- 2015-09-03
- Superseding
- C57.12.58-1991
- Board Approval
- 2017-06-15
- History
-
- Published:
- 2017-11-13
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/TR - Transformers
- Working Group
-
DryType-WGC57.12.58 - Dry Type Transformers - Transient Analysis Working Group
Learn More About DryType-WGC57.12.58 - Dry Type Transformers - Transient Analysis Working Group - IEEE Program Manager
- Patrycja Jarosz
Contact Patrycja Jarosz - Working Group Chair
- Roger Wicks
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
C57.12.58-1991
IEEE Guide for Conducting a Transient Voltage Analysis of a Dry-Type Transformer Coil
General recommendations for measuring voltage transients in dry-type distribution and power transformer are provided. Recurrent surge voltage generator circuitry, instrumentation, test sample, test point location, mounting the test coil, conducting the test, and reporting results are covered.
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards