This guide describes field test methods that assure that current transformers are connected properly, are of marked ratio and polarity, and are in a condition to perform as designed both initially and after having been in service for a period of time.
- Standard Committee
- PE/PSRCC - Power System Relaying and Control
- Status
- Active Standard
- PAR Approval
- 2013-12-11
- Superseding
- C57.13.1-2006
- Board Approval
- 2017-12-06
- History
-
- Published:
- 2018-10-31
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/PSRCC - Power System Relaying and Control
- Working Group
-
C57.13.1_WG - Field Testing of Relaying Current Transformers
Learn More About C57.13.1_WG - Field Testing of Relaying Current Transformers - IEEE Program Manager
- Malia Zaman
Contact Malia Zaman - Working Group Chair
- Bruce Magruder
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
C57.13.1-1981
IEEE Guide for Field Testing of Relaying Current Transformers
A description is given of field-test methods that will ensure that the current transformers used as a source of relay input current are connected properly, are of marked ratio and polarity, and are in condition to perform as designed both initially and after a period of service. The standard covers safety considerations; current transformer types and construction and the effect of these on test methods; insulation resistance tests; ratio tests; polarity check; winding and lead resistance (internal resistance); excitation tests; burden measurements; and specialized situations.
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards