In this guide, the field testing methodology and techniques are presented for measuring electrical parameters of AC transmission lines. The topics will include safety precautions; requirements for measuring instruments; measurement of induced voltage and current; phase verification and insulation resistance measurement; DC resistance measurement; off-line parameter measurement of symmetrical transmission line; off-line parameter measurement of asymmetrical transmission lines; eliminating power frequency interference during off-line measurement; zero-sequence parameter measurement with adjacent lines in operation and on-line parameter measurement of transmission lines.
- Standard Committee
- PE/T&D - Transmission and Distribution
- Status
- Active Standard
- PAR Approval
- 2015-09-03
- Board Approval
- 2019-03-21
- History
-
- Published:
- 2019-07-08
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/T&D - Transmission and Distribution
- Working Group
-
GenSystems/AC Trans - Guide for the parameter measurement of AC transmission
Learn More About GenSystems/AC Trans - Guide for the parameter measurement of AC transmission - IEEE Program Manager
- Michael Kipness
Contact Michael Kipness - Working Group Chair
- YAO XIAO
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards