Superseded Standard

IEEE 1267-1999

IEEE Guide for Development of Specification for Turnkey Substation Projects

The technical requirements to engineer, design, specify, fabricate, manufacture, furnish,install, test, commission, and provide as-built documents for air-insulated substations are covered.This guide investigates the methods, practices, and requirements of both users and suppliers in order to promogate a systematic and coordinated approach for development of specifications for turn-key substation projects.

Standard Committee
PE/SUB - Substations
Status
Superseded Standard
Superseded by
1267-2019
Board Approval
1999-06-26
History
ANSI Approved:
2006-03-28
ANSI Withdrawn Date:
2016-08-19
Published:
1999-12-30
Reaffirmed:
2005-12-07

Working Group Details

Society
IEEE Power and Energy Society
Standard Committee
PE/SUB - Substations

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.