Systematic methodology, guidelines and practices for developing turnkey substation specifications are provided in this guide. Guidance on engineering, procurement, construction, testing and commissioning, quality assurance/quality control and training is provided.
- Standard Committee
- PE/SUB - Substations
- Status
- Active Standard
- PAR Approval
- 2010-12-08
- Superseding
- 1267-1999
- Board Approval
- 2019-02-08
- History
-
- Published:
- 2019-03-15
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/SUB - Substations
- Working Group
-
WGD8 - Development of Specification for Turnkey Substation Projects
Learn More About WGD8 - Development of Specification for Turnkey Substation Projects - IEEE Program Manager
- Patricia Roder
Contact Patricia Roder - Working Group Chair
- Michael Nadeau
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
P1267
Guide for Development of Specifications for Turnkey Substation Projects
The scope of this guide is to provide methodologies and practices for a systematic and coordinated approach for the development of requirements and specifications for turnkey substation projects.
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards