A review of generally accepted applications and coordination of protection for power system distribution lines is presented. The advantages and disadvantages of schemes presently being used in protecting distribution lines are examined in this guide. Identification of problems with the methods used in distribution line protection and the solutions for those problems is included.
- Standard Committee
- PE/PSRCC - Power System Relaying and Control
- Status
- Active Standard
- PAR Approval
- 2014-03-27
- Superseding
- C37.230-2007
- Board Approval
- 2020-12-03
- History
-
- Published:
- 2021-03-19
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/PSRCC - Power System Relaying and Control
- Working Group
-
C37.230_WG-D28 - Protective Relay Applications to Distribution Lines Working Group
Learn More About C37.230_WG-D28 - Protective Relay Applications to Distribution Lines Working Group - IEEE Program Manager
- Malia Zaman
Contact Malia Zaman - Working Group Chair
- Brian Boysen
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
C37.230-2007
IEEE Guide for Protective Relay Applications to Distribution Lines
A review of generally accepted applications and coordination of protection for radial power system distribution lines is presented. The Guide examines the advantages and disadvantages of schemes presently being used in protecting distribution lines. Identification of problems with the methods used in distribution line protection and the solutions for those problems are included.
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards